-
Walt Disney Imagineering
Wed, Mar 29, 2006 @ 05:30 PM - 07:00 PM
Viterbi School of Engineering Student Organizations
Student Activity
One of the biggest challenges on any fast track project is timely
preconstruction visualization and assurance that the design release
plan continues to support an optimal construction schedule. Risk
potential can be decreased using timely 4D visualization. 4D
scheduling allows the project team and contractors to quickly
visualize installation sequences on a complex project by integrating
thousands of drawings into composite 3D time framed images and
determine the most efficient installation sequences and crane access
to optimize their schedules.Expedition Everest is a high speed train ride adventure through the
majestic Himalayan mountains and over creaking trestles into the
haunts of the legendary Yeti. The Expedition Everest project team had
to closely coordinate construction of the Nepalese Village, the 200
foot tall mountain, the ride system, and the surrounding area
development to maintain crane and installation access.More detail on the construction of the Expedition Everest project can
be found at:http://www.wdwmagic.com/beastly.htmhttp://disneyworld.disney.go.com/wdw/parks/attractionDetail?
id=ExpeditionEverestPageLocation: Von Kleinsmid Center For International & Public Affairs (VKC) - 156
Audiences: Everyone Is Invited
Contact: IEEE